Petroleum Refining
Over the last decade, Eichleay has completed hundreds of petroleum refining projects with a total installed cost in excess of $600,000,000. These projects range in size from small single-unit revamps to major upgrades and expansions. Areas of the refining process in which we specialize include crude distillation, hydro-processing, FCC, coking, octane enhancement, hydrogen production, and sulfur removal. We also possess significant storage tank, pipeline, wharf, marine loading, and marine vapor control system expertise. These broad capabilities combined with regimented work processes, skilled professionals, and knowledge of our client's refinery operations enable us to totally integrate utility and offsite systems and seamlessly match project OSBL and ISBL interfaces.
|
|
|
Project Profiles
|
|
|

Valero Refining Company Benicia Refinery
|
ULSD (Ultra Low Sulfur Diesel) Project Total Installed Cost: $110 million
Provided complete OSBL engineering packages for all interconnecting piping, electrical, controls, and support facilities for grass roots project. |
|
|
|
SGU (Scrubber Gas Unit) Tail Gas Scrubber Project Total Installed Cost: $12 million Provided the complete process and design package for a project to expand the scrubbing capacity of a Sulfur Gas Unit. |
|
|
|
Alky Debottlenecking Project Total Installed Cost: $24 million Provided project management and OSBL design package to expand existing unit capacity. |
|
|
|
NRU (Naptha Reforming Unit) Bimetallic Catalyst Project Total Installed Cost: $8 million Provided the complete design package for a fast-track project to revamp the catalyst regeneration facilities for Naphtha Reactors. |
|
|
|

Tesoro Refining and Marketing Corporation Golden Eagle Refinery
|
Crude Receiving Upgrade Projects Total Installed Cost: $25 million Provided complete project design services including preliminary engineering, basic/detailed design, as well as project cost estimates. Responsibilities also included the procurement of all engineered equipment plus pipe/valves/fittings for this fast-track project. Construction support roles included RFI/DCN, construction coordination, project record books, and as-built drawings. |
|
|
|
Loading Rack Upgrade Project Total Installed Cost: $5 million Provided project design services through three stages of project development, including project cost estimates, project risk analyses, and coordination with other refineries. |
|
|
|
Tract 1 Heavy Oil Tankage Project Total Installed Cost: $15 million Providing project design services through two stages of project development including cost estimates. This project includes close coordination of vendor and contractor requirements for two 131BBL tanks, and service changes on five other tanks with heater and pumping systems. |
|
|
|
|
|