Energy & Chemicals
Case Studies
Heat Integration & Decarbonization
An opportunity was identified for potential cost savings in the Isomax unit by conserving heat and reducing emissions. The project replaced 8 heat exchangers with 12 new upgraded alloy heat exchangers, to withstand the new proposed temperatures and pressures.
Key Highlights
- Installed a new platform 26 feet above existing exchangers to support new equipment
- Utilized exotic metallurgy, 9 Chrome, 825/625 Alloy, for aggressive corrosion, temperature, and high pressure
- Fast-track project methods were used to accelerate project execution
- Sourced equipment, structural steel and piping globally (Italy, China, India, Korea, Japan, Mexico, United States) under a compressed procurement schedule requiring innovative sourcing strategies
$100MM
Total Installed Cost
80%
Pre-construction to Minimize Production Downtime
24/7
Engineering Field Support During TAR
Flue Gas Scrubber
The refinery required a flue gas scrubber system to meet stringent EPA emissions regulations and avoid potential facility shutdowns. Eichleay was tasked with executing this grassroots environmental compliance project, inheriting a schedule already one year behind. Leveraging its expertise, Eichleay successfully delivered the project on time, ensuring compliance with emission standards while maintaining the refinery’s operational continuity.
Project included installation of environmental compliance systems to reduce particulate, NOx, and SOx emissions:
- (2) High pressure CO furnaces
- (2) KTI SCR units
- Waste heat boiler
- Pre-scrubber unit
- Absorber tower
$750MM
Total Installed Cost
500
Pieces of Equipment Procured
600
Peak Construction Work Force
SPI Administration Programs
Eichleay has a proven track record of providing comprehensive SmartPlant Instrumentation (SPI) administration services across multiple industries. With decades of expertise, we have supported various clients in streamlining instrumentation data management, implementing SPI solutions, and delivering tailored support to meet project-specific needs.
Client SPI Program
Since 2007, Eichleay has been a trusted partner, providing SPI administration services at multiple refineries nationwide. At a major client site we played a pivotal role in building the Smart Instrumentation (SI) domain from the ground up, in collaboration with the I/E group. Our team established standards and developed training guides for all users.
Key responsibilities included:
- Daily troubleshooting and enhanced loop layout management
- Overseeing the importation of loops and tags
- Providing field verification and support
18 Years
Supporting Client for SPI Admin Services
20
Clients/Site Locations We Provide SPI Services
West Coast Refinery SPI Conversion Project
Eichleay successfully converted over 2,400 CAD loop diagrams into SPI format. Our team provided end-to-end support, from upgrading and developing site-standard formats for loop diagrams to managing extensive data imports.
Key achievements included:
- Delivering critical project documentation such as P&IDs and wiring diagrams
- Building missing hardware, including J-boxes, marshalling racks, and PLC panels
- Importing over 10,000 updated instrument specification sheets into the SPI database
- Managing SPI database upgrades and ensuring seamless integration with local staff during project execution
This project highlights Eichleay’s ability to manage large-scale SPI conversions and upgrades, ensuring accuracy and efficiency throughout the process.
Capital Project Site Programs
Eichleay has over 25 years of experience providing support to refinery clients for small to large project capital site programs. We have provided both on-site and off-site project teams for multiple clients at site locations across the western US. We have experience executing projects within a wide range of refining processes, focusing on process optimization, equipment design, and facility upgrades to enhance efficiency, safety and reliability.
Key Benefits
- Integrated teams working in partnership with the client to achieve project and program goals
- Familiarity with client standards and preferences for streamlined project execution achieving schedule and cost savings
- Dedicated project teams providing consistent expertise
28 Years
Longest Ongoing Client Partnership
200+
Projects Executed Annually for Programs
125 FTEs
Largest Team Supporting an Individual Facility
Trusted for over 25 years to deliver capital project excellence across multiple clients
SF Bay Area Onsite Capital Project Program
- Delivering value to the client since 1997
- Eichleay executes 80-100 projects annually
- Provide onsite dedicated staff along with additional overflow office support as needed
PNW Small-Cap and Reliability Program
- Ongoing partnership since 2018
- Provide dedicated support with an onsite team of 30-40 people
- Execute ~90 projects annually (<$2 MM TIC)
California Small to Large-Cap Projects Program
- Support for Northern California & Southern California refineries
- Trusted partnership for over a decade
- Average 20-30 projects per year ranging from <$1MM up to $100MM TIC
Refinery Small to Medium Projects Program
- Provide support across 6 site locations with majority of projects in Montana and Oklahoma
- 14+ years of trusted partnership
- Over 200 projects and 194,000 hours of services provided